The challenge

The existing floor had to be broken out and removed inside the building, with plant working between the steel columns, before a new sub-base and floor could go in.

How we delivered it

  1. Stage 1: Breaking out

    The existing floor was broken out with an excavator-mounted breaker.

    Excavator with a hydraulic breaker taking out an old floor inside a steel-framed industrial building
  2. Stage 2: Removal

    The broken material was loaded and removed from inside the building.

    Excavators breaking out and loading inside an industrial building
  3. Stage 3: Sub-base

    A new sub-base was placed and compacted, ready for the new floor.

    Excavator and roller working on a prepared sub-base inside an industrial building

The result

The old floor out, and a compacted sub-base ready for the new floor slab.

About our concreting & tarmacing work
Typical section: Ground bearing slab build-up. Concrete slab with steel mesh, Damp-proof membrane, Compacted granular sub-base.TopsoilClaySand and gravelBearing stratum -1.0-2.0-3.0-4.0metresGL±0.00123

Key

  1. Concrete slab with steel mesh
  2. Damp-proof membrane
  3. Compacted granular sub-base

Section A-A

Ground bearing slab build-up

Scale

NTS

Typical section: concreting & tarmacing. Indicative, not to scale.