Mains sewer connections, new build drainage and attenuation tanks, across Wigan and the North West.

Our team is Street Works and Confined Spaces trained, and experienced in completing United Utilities documentation, so connections proceed without complication.

Concrete manhole ring set in stone within a timber-shored excavation
Manhole ring going in, trench shored
Typical section: Foul drainage and sewer connection. Inspection chamber with cover and frame, Foul drain laid to fall on granular bedding, Connection to the public sewer.TopsoilClaySand and gravelBearing stratum -1.0-2.0-3.0-4.0metresGL±0.00123

Key

  1. Inspection chamber with cover and frame
  2. Foul drain laid to fall on granular bedding
  3. Connection to the public sewer

Section A-A

Foul drainage and sewer connection

Scale

NTS

Typical section: sewer connections & drainage. Indicative, not to scale.

The challenge

Connections are where projects stall

A sewer connection involves the water company, the highway and a confined space. If the paperwork or the qualifications are not in place, the work waits.

We have delivered specialist groundworks across the North West since 2008. We know where these projects go wrong, and we plan for it before work starts.

What we deliver

Sewer connections & drainage, done properly

Sewer connections

Mains sewer connections across the North West, carried out by our own qualified team. We complete the United Utilities documentation so the work proceeds without delay.

New build drainage

Drainage that is planned, not rushed. Every run takes account of the ground type, the position of the house, garden and road, and above all future access.

Attenuation tanks

Attenuation tanks to control surface water run-off on developments and commercial sites, installed as part of the drainage design.

A drainage problem at home?

Collapsed drains, new connections and drainage for extensions. Call us and describe the problem, and we will advise on what it needs.

Our process

Site to sign-off

Three steps, whether it is a machine base for a factory or a treatment plant for a farmhouse.

  1. Step 1: Tell us about the project

    Call us or send the drawings. If it helps, we will arrange a site visit.

  2. Step 2: A clear price, with the risks identified

    We review the ground conditions, access and programme, and raise anything that could add cost later, while it is still inexpensive to resolve.

  3. Step 3: Delivered and signed off

    Built to programme by our own team and plant, and handed over with the paperwork that goes with it.

What our clients say

“Your staff were a credit to you. They got on with the job in hand without any fuss and with a positive attitude.”

Aqua Fabrications LtdMore from our clients

What is at stake

When groundworks goes wrong

  • Connections delayed by incomplete paperwork
  • Drainage that fails inspection or cannot be maintained
  • Third parties needed for road and chamber work

When it is done right

A connection made and signed off, and drainage that can be accessed and maintained for years to come.

What affects the price

Every project is priced on its own requirements. These are the factors that make the biggest difference, and we will discuss each one with you before work starts.

  • Depth of the sewer and distance to the connection point
  • Connections in the highway, which require traffic management
  • Ground conditions and water in the trench
  • Surface reinstatement
  • The attenuation volume the site requires

Accreditations for this work

See all our accreditations

  • Street Works qualified

    Sewer connections and openings in the highway are carried out by our own team, not passed to a third party.

  • Confined Spaces

    Connections and chamber work proceed without waiting for a specialist subcontractor.

  • WRAS

    Water supply work is done to the regulations the water company checks against.

  • Substructure with blue membrane laid and orange drainage pipes coming through the slab area
    Membrane down and drainage through the slab
  • Orange drainage pipe and junction laid in a trench beside a new brick wall
    New build drainage, junction in
  • OGC excavator digging a trench across open parkland
    Trenching across parkland
  • Operative digging around drainage chambers in an open trench next to a block wall
    Drainage chambers going in

Questions we get asked

Can you deal with United Utilities for us?

Yes. We are experienced in completing United Utilities documentation, which is often what delays a connection.

Can you work in the public highway?

Yes. Our team holds Street Works qualifications, which are required for work in the public highway.

Do you carry out domestic drainage?

Yes, alongside our commercial work. Call us and describe the problem.

Have a project that needs pricing?

Send us the drawings, or we will arrange a site visit. We will give you a clear price and tell you about any risks we can see.

01942 321 423