Specialist machine foundations

  • Commercial

A machine foundation has to be accurate to the manufacturer’s tolerances, and it is often built while the rest of the facility keeps running.

We build foundations for heavy plant and machinery to the client’s brief and the manufacturer’s technical specification, from a single conveyor pit to a complex multi-level installation. Every procedure is supported by risk assessments and method statements (RAMS).

Finished concrete machine pit with stepped recesses and pockets cast to suit the equipment
A machine pit, cast with its recesses and pockets
Typical section: Machine pit with cast-in fixings. Machine (by others), shown dashed, Holding-down bolts cast in, Reinforced concrete pit to the manufacturer’s drawing.TopsoilClaySand and gravelBearing stratum -1.0-2.0-3.0-4.0metresGL±0.00123

Key

  1. Machine (by others), shown dashed
  2. Holding-down bolts cast in
  3. Reinforced concrete pit to the manufacturer’s drawing

Section A-A

Machine pit with cast-in fixings

Scale

NTS

Typical section: specialist machine foundations. Indicative, not to scale.

The challenge

The machine is only as accurate as its base

A base that is out of level or out of position delays commissioning, and putting it right means breaking out concrete next to equipment that is already on site.

We have delivered specialist groundworks across the North West since 2008. We know where these projects go wrong, and we plan for it before work starts.

What we deliver

Specialist machine foundations, done properly

Heavy machinery foundations

Bases for presses, lathes and production lines, with pockets, recesses and holding-down bolts cast in where the equipment requires them.

Pits and conveyors

From a single conveyor pit to multi-level machinery pits, formed, reinforced and poured to the drawings.

Weighbridges

The specialist foundations a weighbridge station requires, built so the bridge sits level and weighs accurately.

Crane pads and dock levellers

Crane pads designed for the loads, and foundations for dock levellers on new and existing sites.

Complete factory foundations

A full set of foundations for a larger factory, including the car park and loading docks, with one contractor responsible for the groundworks package.

Our process

Site to sign-off

Three steps, whether it is a machine base for a factory or a treatment plant for a farmhouse.

  1. Step 1: Tell us about the project

    Call us or send the drawings. If it helps, we will arrange a site visit.

  2. Step 2: A clear price, with the risks identified

    We review the ground conditions, access and programme, and raise anything that could add cost later, while it is still inexpensive to resolve.

  3. Step 3: Delivered and signed off

    Built to programme by our own team and plant, and handed over with the paperwork that goes with it.

What our clients say

“We have been very pleased with project delivery to our requirements – within timescale, budget, and most importantly to our demanding health and safety standards.”

Aggregate Industries ConcreteMore from our clients

What is at stake

When groundworks goes wrong

  • Commissioning delayed while the base is corrected
  • Production downtime from a poorly planned dig
  • RAMS rejected by your health and safety team

When it is done right

A base that matches the manufacturer’s drawings, delivered around your operation, with the paperwork your health and safety team expects.

What affects the price

Every project is priced on its own requirements. These are the factors that make the biggest difference, and we will discuss each one with you before work starts.

  • The manufacturer’s specification and tolerances
  • Breaking out and removing an existing floor
  • Working around a facility that remains in operation
  • Pit depth and the reinforcement design
  • Out of hours working to avoid production downtime

Accreditations for this work

See all our accreditations

  • CHAS accredited contractor

    Our health and safety management has already been independently assessed, which shortens your pre-qualification.

  • Avetta (formerly PICS)

    If your organisation manages its supply chain through Avetta, we are already registered.

  • CPCS

    Plant on your site is operated by carded, competent operators.

  • Worker in hi-vis standing in a deep reinforced foundation excavation with steel shuttering, excavator behind
    Reinforced base, steel in, ready for the pour
  • Steel shuttering panels propped along a deep reinforced foundation
    Shuttering propped along a deep reinforced base
  • Excavator with a hydraulic breaker taking out an old floor inside a steel-framed industrial building
    Breaking out an old floor inside an industrial unit
  • Excavator and roller working on a prepared sub-base inside an industrial building
    Sub-base going in for a new internal floor
  • Deep propped formwork and reinforcement for a large concrete base
    Propped formwork for a deep base
  • Excavators breaking out and loading inside an industrial building
    Breaking out inside an industrial building

Questions we get asked

Can you work while the factory is operating?

Yes. We plan the work around ongoing operations and can work out of hours, at weekends or overnight, to minimise disruption to production.

Do you provide RAMS?

Yes. Every procedure and structure is supported by risk assessments and method statements.

Have a project that needs pricing?

Send us the drawings, or we will arrange a site visit. We will give you a clear price and tell you about any risks we can see.