Case study
Deep reinforced concrete base
A deep reinforced base formed with steel shuttering.

The challenge
A deep excavation had to be formed with steel shuttering and reinforced before a large, heavy pour.
How we delivered it
Stage 1: Reinforcement
The reinforcement was fixed in the deep excavation, ready for inspection.

Stage 2: Shuttering
Steel shuttering was propped along the base to hold the pour.

The result
A deep base formed, reinforced and ready for the pour.
About our foundations workKey
- Reinforced concrete ring beam
- Bored piles founded in the bearing stratum
- Pile reinforcement cage
Section A-A
Piled foundation with ring beam
Scale
NTS
Typical section: foundations. Indicative, not to scale.
More projects
All projects
CommercialConcreting & tarmacing
Commercial car park
A finished commercial car park with kerbed planting and accessible bays.
Read the case study
AgriculturalRotary milking parlours
Rotary milking parlour, from excavation to installation
The complete civils for a rotary milking parlour, built inside an existing farm building.
Read the case study
IndustrialConcreting & tarmacing
Internal floor replacement in an industrial building
Breaking out and replacing the floor inside a steel-framed industrial building.
Read the case study
Planning a similar project?
Send us the drawings, or we will arrange a site visit. We will give you a clear price and tell you about any risks we can see.