Case study

Deep reinforced concrete base

A deep reinforced base formed with steel shuttering.

Worker in hi-vis standing in a deep reinforced foundation excavation with steel shuttering, excavator behind

The challenge

A deep excavation had to be formed with steel shuttering and reinforced before a large, heavy pour.

How we delivered it

  1. Stage 1: Reinforcement

    The reinforcement was fixed in the deep excavation, ready for inspection.

    Worker in hi-vis standing in a deep reinforced foundation excavation with steel shuttering, excavator behind
  2. Stage 2: Shuttering

    Steel shuttering was propped along the base to hold the pour.

    Steel shuttering panels propped along a deep reinforced foundation

The result

A deep base formed, reinforced and ready for the pour.

About our foundations work
Typical section: Piled foundation with ring beam. Reinforced concrete ring beam, Bored piles founded in the bearing stratum, Pile reinforcement cage.TopsoilClaySand and gravelBearing stratum -1.0-2.0-3.0-4.0metresGL±0.00123

Key

  1. Reinforced concrete ring beam
  2. Bored piles founded in the bearing stratum
  3. Pile reinforcement cage

Section A-A

Piled foundation with ring beam

Scale

NTS

Typical section: foundations. Indicative, not to scale.